Risk-indexed artificial neural network for predicting duration and cost of irrigation canal-lining projects using survey-based calibration and python validation
Faculty
Engineering
Year:
2025
Type of Publication:
ZU Hosted
Pages:
Authors:
Ahmed Hussien Ibrahim Mahmmoud
Staff Zu Site
Abstract In Staff Site
Journal:
Scientific Reports Springer Nature
Volume:
Keywords :
Risk-indexed artificial neural network , predicting duration
Abstract:
The purpose of this study is to develop and validate a risk-driven predictive model for estimating project duration and cost in irrigation canal lining projects, where uncertainties often lead to delays and budget overruns. Ninety-three factors were first reduced to twenty using AHP–RII (Cronbach’s ). A multi-layer perceptron (128–64–32, ReLU, Adam, early stopping) was trained on 5000 simulated scenarios and validated on eight projects with leave-one-project-out cross-validation. The model had (training), 0.82 (testing), and made errors within the limits of 0.87 months (time) and EGP 102,500 (cost) on average.The developed model was deployed as a Python-based desktop application, enabling engineers and planners to generate accurate time and cost forecasts during early project stages. This research introduces an integrated ANN-based framework that combines expert-driven risk assessment with machine learning, providing a practical decision-support tool for infrastructure projects.
Author Related Publications
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Modelling the Financial Performance of Construction Companies Using Neural Networks via Genetic Algorithm.", Canadian Journal of Civil Engineering (CJCE), 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Estimating Cost Contingency for Highway Construction Projects Using Analytic Hierarchy Processes.", International Journal of Computer Science Issues (IJCSI), 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Reducing Construction Disputes through Effective Claims Management.", American Journal of Civil Engineering and Architecture (AJCEA), Science and Education Publishing,, 2014
More
Department Related Publications
Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021
More
Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف