Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Assessment of estimation performance for activities’ cost and time in construction projects using statistical process control
Faculty
Engineering
Year:
2025
Type of Publication:
ZU Hosted
Pages:
Authors:
Ahmed Hussien Ibrahim Mahmmoud
Staff Zu Site
Abstract In Staff Site
Journal:
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT Emerald Publishing
Volume:
Keywords :
Assessment , estimation performance , activities’ cost , time
Abstract:
Purpose The cost and duration estimation process is important to be monitored and controlled in construction projects. Estimation variation from actuals presents a problem when attempting to complete a project on planned time and budget. Various studies cover project performance monitoring with different cost and time performance indices. Nevertheless, project monitoring techniques do not take advantage of the available data to assess the performance and accuracy of estimates developed by the estimation team. Design/methodology/approach This research proposes using statistical process control (SPC) to assess the consistency and stability of the estimation of activities’ costs and durations. The proposed system calculates the deviation of the estimated costs and durations from the actual values. These calculations are the activities’ indices that are used to plot the control chart. The process capability analysis (PCA) is used to determine the accuracy deviation of the estimations from the organization’s targets. Findings Results of the proposed system application to a real project determine the activities that have inaccurate cost and duration estimations. This result helps the estimation departments to analyze reasons for inaccurate estimations. The proposed system is an easy, effective tool for continuous improvement to the performance of the estimation department. Originality/value Some projects are classified as troubled projects when calculating the status of the project with reference to estimations, while the estimations themselves are troubled and need to be corrected. The proposed system of this paper is considered a novel approach by using SPC techniques such as control charts and process capability analysis for continuous monitoring and assessing of cost and duration estimation process performance to improve process accuracy and increase the credibility of estimation teams or departments.
Author Related Publications
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Modelling the Financial Performance of Construction Companies Using Neural Networks via Genetic Algorithm.", Canadian Journal of Civil Engineering (CJCE), 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Estimating Cost Contingency for Highway Construction Projects Using Analytic Hierarchy Processes.", International Journal of Computer Science Issues (IJCSI), 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014
More
Ahmed Hussien Ibrahim Mahmmoud, "Reducing Construction Disputes through Effective Claims Management.", American Journal of Civil Engineering and Architecture (AJCEA), Science and Education Publishing,, 2014
More
Department Related Publications
Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021
More
Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف