Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Factors affecting delays in oil and gas construction projects
Faculty
Engineering
Year:
2025
Type of Publication:
ZU Hosted
Pages:
Authors:
Ahmed Abdelaaty Gaballah Elsayaad
Staff Zu Site
Abstract In Staff Site
Journal:
Scientific Reports Springer Nature
Volume:
Keywords :
Factors affecting delays , , , , construction projects
Abstract:
Ensuring the timely completion of construction projects is vital for overall efficiency. This study aims to identify, classify, and rank the main factors of delay in Egyptian oil and gas construction projects related to project stakeholders. A mixed-methods approach was used to Sharkia collect and analyze both quantitative and qualitative data. Data was gathered from 71 sector respondents. Expert interviews refined the delay factors from the literature to 20 for contractors, 17 for owners, and 13 related to consultants. Financial difficulties, late payments to suppliers and subcontractors, and supplier material delivery delays were the significant causes related to the contractor. Delays associated with owners came from ineffective contractor selection and government regulations. Consultants contributed to delays in finalizing drawings and designs. To provide a deeper understanding of the interrelationships among these factors and their collective effect on project delay, a structural model was developed and evaluated. The structural model demonstrated that deficiencies in project planning, design management, and owner decision-making collectively contribute to delays. This provides a basis for developing integrated management approaches to mitigate future delays and improve project performance in Egypt’s oil and gas construction sector.
Author Related Publications
Ahmed Abdelaaty Gaballah Elsayaad, "Value Engineering in Egyptian Bridge Construction", Journal of Construction Eng. and Management, ASCE, 1991
More
Ahmed Abdelaaty Gaballah Elsayaad, "Construction of Ameria Caisson in Egypt", Journal of Construction Engineering and Management, ASCE, 1995
More
Ahmed Abdelaaty Gaballah Elsayaad, "Problems Facing Parties Involved in BOT Projects in Egypt", Journal of Management in Eng., ASCE, 2002
More
Ahmed Abdelaaty Gaballah Elsayaad, "Finance-Based Scheduling of Construction Projects Using Integer Programming", Journal of Construction Eng. and Management, ASCE, 2004
More
Ahmed Abdelaaty Gaballah Elsayaad, "Project-Based Course for Practicing Construction Project Management", Proceedings, 6th Saudi Engineering Conference, Vol. 1, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia, 2002
More
Department Related Publications
Ahmed Hessien Mahmoud Mohamed Elyamany, "A Performance Evaluating Model For Construction Companies: Egyptian Case Study", ASCE, 2008
More
Ahmed Abdelaaty Gaballah Elsayaad, "Construction of Ameria Caisson in Egypt", Journal of Construction Engineering and Management, ASCE, 1995
More
Ismaiel Abdelhamied Mohamed Basha, "Construction of Ameria Caisson in Egypt", Journal of Construction Engineering and Management, ASCE, 1995
More
Mohamed Ismail Ahmed Amer, "Construction of Ameria Caisson in Egypt", Journal of Construction Engineering and Management, ASCE, 1995
More
Ahmed Abdelaaty Gaballah Elsayaad, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014
More
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف