Critical Construction Readiness Factors for Bridge Projects

Faculty Engineering Year: 2025
Type of Publication: ZU Hosted Pages: Pages 291-318
Authors:
Journal: Civil Engineering Journal CEJ Publishing Group Volume: Volume 10
Keywords : Critical Construction Readiness Factors , Bridge Projects    
Abstract:
Egyptian investment in infrastructure projects is considerable, especially in bridge construction projects that commonly face delays, cost overruns, rework, and poor productivity. A proper construction readiness (CR)assessment can enhance project performance. This study aims to identify the critical factors that impact the CR of bridge projects in Egypt. Througha literature review and a pilot study with ten highly experienced professionals, a list of 43 constructionreadiness factors (CRFs) was prepared. To quantitatively rank these CRFs and identify the critical ones, a questionnaire was administered through structured interviews with 92 project managers and engineers experienced in bridge construction projects in Egypt. The participants represented the perspectives of contractors, owners, and consultants. A CRF with a normalized mean score greater than or equal to 0.5 was classified as a critical construction readiness factor (CCRF). For these CCRFs, agreement analysis among contractors, owners, and consultants was conducted using the Kruskal-Wallis test. The correlation strength was also investigated using Spearman's correlation. In total, 16 CCRFs were identified, with the top five: verification of underground utility locations, completion of land surveying work, issuance of clear and sufficient construction drawings, adequate geotechnical investigations, and obtaining all necessary permits and approvals from local authorities. This study provides practitioners withcritical factors necessary for assessing the CR of bridge projects in Egypt. From an academic standpoint, it enhances understanding of CR, which is rarely discussed.
   
     
 
       

Author Related Publications

  • Adel Mohamed Taha Elkelsh , "calibration chamber modeling of compaction grouting", Geotechnical testing journal, 2008 More
  • Adel Mohamed Taha Elkelsh , "case history of intermittent treatment by compaction grout piles", Proceedings of 18th International offshore and polar engineering conference, 2008 More
  • Adel Mohamed Taha Elkelsh , "Investigation into effectiveness of by-pass cement dust as soil stabilizer in road construction", International journal of current engineering and technology, 2016 More
  • Adel Mohamed Taha Elkelsh , "Field investigation into effectiveness of compaction grouting", Journal of geotechnical and geoenvironmental engineering, ASCE, 2012 More
  • Adel Mohamed Taha Elkelsh , "Effectiveness of compaction grout piles in improving foundation soils of existing runway", Proceedings of 6th International conference on case histories in geotechnical engineering, 2008 More

Department Related Publications

  • Islam Magdy Mohamed Deff, "Effect of Using Polymers on Bituminous Mixtures Characteristics in Egypt", www.iosrjournals.org, 2014 More
  • Manal Abdallah Ahmed Ismaiel, "Investigation of Flexible Pavement Premature Cracking", موقع المؤتمر على الانترنت, 2013 More
  • Hossameldien Hosny Mohamed Badie, "The neural network model for predicting the financing cost for construction projects", Int. J. Project Organisation and Management, 2009 More
  • Hossameldien Hosny Mohamed Badie, "Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model", Housing and Building National Research Center, 2012 More
  • Hossameldien Hosny Mohamed Badie, "Optimum Organizational Structure for Construction Projects (Management Tool of Selecting Organization in Egyptian Construction Market)", International Journal of Engineering Science and Innovative Technology (IJESIT), 2013 More
Tweet