Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Assessment of Estimation Performance for Activities’ Cost and Time in Construction Projects Using Statistical Process Control
Faculty
Engineering
Year:
2025
Type of Publication:
ZU Hosted
Pages:
Authors:
Hossam Mohamed Wahba Toma
Staff Zu Site
Abstract In Staff Site
Journal:
Engineering, Construction and Architectural Management Journal EMERALD
Volume:
Keywords :
Assessment , Estimation Performance , Activities’ Cost , Time
Abstract:
Cost and duration estimation process is important to be monitored and controlled in construction projects. Estimation variation from actuals presents a problem when attempting to complete a project on planned time and budget. Various studies cover project performance monitoring with different cost and time performance indices. Nevertheless, project monitoring techniques do not take advantage of the available data to assess the performance and accuracy of estimates developed by the estimation team. This research proposes using statistical process control (SPC) to assess the consistency and stability of the estimation of activities’ costs and durations. The proposed system calculates the deviation of the estimated costs and durations from the actual values. These calculations are the activities’ indices that are used to plot the control chart. The process capability analysis (PCA) is used to determine the accuracy deviation of the estimations from the organization’s targets. Results of the proposed system application to a real project determine the activities that have inaccurate costs and durations estimations. This result helps the estimation departments to analyze reasons for inaccurate estimations. The proposed system is an easy effective tool for continuous improvement to the performance of the estimation department.
Author Related Publications
Hossam Mohamed Wahba Toma, "Tunnel Lining Methods: Selection of an Efficient Method", Interscience, 2012
More
Hossam Mohamed Wahba Toma, "Tunnelling with Less Problems: A Model for Selecting Efficient Tunnelling Systems", LAB LAMBERT Academic Publishing, 2011
More
Hossam Mohamed Wahba Toma, "Predicting Construction Waste in Egyptian Residential Projects: A Robust Multiple Regression Model Approach", Springer Nature, 2025
More
Hossam Mohamed Wahba Toma, "Request for Proposal (RFP) Quality Measurement: in Engineering, Management Consulting Projects", Zagazig University, 2025
More
Hossam Mohamed Wahba Toma, "Factors affecting the resale value of construction equipment and their relative impact", ELSEVIER, 2023
More
Department Related Publications
Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021
More
Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف