Investigation into Factors Affecting Penetration Rate and Favorable Ground Types of Pipe Jacking

Faculty Engineering Year: 2023
Type of Publication: ZU Hosted Pages:
Authors:
Journal: Open Construction and Building Technology Journal Bentham Science Publishers Volume:
Keywords : Investigation into Factors Affecting Penetration Rate    
Abstract:
Improper assessment of the penetration rate (PR) of pipe jacking (PJ) may lead to serious schedule delays and cost overruns. In the current practice, PR is estimated on the basis of the experience of practitioners. This has resulted in predicted PR values that are not consistent with the actual ones. A guideline that can be used to reliably predict PR and account for the effects of the significantly controlling factors is not available. This negatively affects the estimated project time and cost. The problems stem from the many factors that affect PR such as the ground conditions, installation depth, machine type, operator experience, and pipe diameter. Little research has been made in this regard. So this research will focus on two main objectives; the first is to identify, categorize and rank the factors that affect PR, and the second is to investigate the common types of ground and PJ machines in Egypt and the Middle East to determine the favorable ground types for PJ machines.
   
     
 
       

Author Related Publications

  • Soad hosny Anany Awadallah, "(Highway Environmental Pollution Index (HEPI", للإتحاد الدولى للطرق, 2013 More
  • Soad hosny Anany Awadallah, "Cost Pollution Trade-Off Optimization in Highway Construction", جامعة الأزهر, 2014 More
  • Soad hosny Anany Awadallah, "Investigating the Significance of material price indicators in the Egyptian construction market", ngzagazig university, faculty of engineeri, 2024 More
  • Soad hosny Anany Awadallah, "Manpower Motivation Factors and Theories in the Egyptian Construction Projects", Faculty of Engineering , Zagazig University, 2023 More
  • Soad hosny Anany Awadallah, "Causes of Reinforced Concrete Materials Waste in Construction Projects", faculty of engineering, zagazig university, 2022 More

Department Related Publications

  • Ahmed Abdelaaty Gaballah Elsayaad, "Finance-Based Scheduling of Construction Projects Using Integer Programming", Journal of Construction Eng. and Management, ASCE, 2004 More
  • Ashraf Mohamed Mohamed Attia Elazony, "Finance-Based Scheduling of Construction Projects Using Integer Programming", Journal of Construction Eng. and Management, ASCE, 2004 More
  • Hossameldien Hosny Mohamed Badie, "Optimum Organization Structure for Construction Projects (Management Tool for Selecting Organization in the Egyptian Construction Market)", IJESIT, 2013 More
  • Hossameldien Hosny Mohamed Badie, "Construction Claims Causes and Management Efficiency", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2013 More
  • Hossameldien Hosny Mohamed Badie, "Evaluation of Change Management Efficiency of Construction Contractors", Housing and Building Research Center (HBRC) Journal , Elsevier., 2013 More
Tweet