Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts

Faculty Engineering Year: 2024
Type of Publication: ZU Hosted Pages:
Authors:
Journal: International Journal of Construction Management Taylor & Francis Volume:
Keywords : Hybrid Evaluation Model , assess , overall barriers    
Abstract:
Public-private partnerships are increasingly being used in many countries as a common management technique to enhance the delivery of public services and major public infrastructure projects. Understanding the project characteristics and obstacles to a public-private partnership is key for those involved to improve implementation. This study focuses on barriers that arise from public-private partnership contact in field wastewater treatment plants and offers a methodology for evaluating the overall barrier for public-private partnership projects by analyzing the relationships between the barrier elements. A primary list of barrier factors and their eight latent project characteristics were collected through literature reviews, then using the Delphi technique to filter the barrier insights concerning project characteristics and develop the final list using field interviews. 207 valid questionnaires were obtained. The data was deconvoluted into crisp numbers using fuzzy set theory, and a second-order structural equation model was used to validate the conceptual model. The results of the study indicate that the availability payment capability group has the highest score of all the groups in this study. This study proposed a model that enables the private sector to measure and evaluate aggregate barriers in projects so that it is easier for decision-makers to determine whether they can choose the project or not
   
     
 
       

Author Related Publications

  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Modelling the Financial Performance of Construction Companies Using Neural Networks via Genetic Algorithm.", Canadian Journal of Civil Engineering (CJCE), 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Estimating Cost Contingency for Highway Construction Projects Using Analytic Hierarchy Processes.", International Journal of Computer Science Issues (IJCSI), 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Reducing Construction Disputes through Effective Claims Management.", American Journal of Civil Engineering and Architecture (AJCEA), Science and Education Publishing,, 2014 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet