Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Performance Analysis of the Permanent and a Regional GNSS Networks in Egypt
Faculty
Engineering
Year:
2019
Type of Publication:
ZU Hosted
Pages:
1590-1597
Authors:
Staff Zu Site
Abstract In Staff Site
Journal:
International Journal of Scientific & Engineering Research IJSER
Volume:
Keywords :
Performance Analysis , , Permanent , , Regional GNSS Networks
Abstract:
Recently, GPS has become the most significant used survey instrument. The GPS performance is affected by the number of tracked satellites, so its performance is degraded in limited sky regions. Thus, one of the good solutions is adding other GNSS satellites and make combined solutions between GNSS systems to increase the number of satellites. In this study, there are two networks; the permanent and regional networks. In the permanent network, a comparative study using GPS, GLONASS and combined GPS with GLONASS has been implemented to investigate the advantages and disadvantages of combined solution. Data processing has been performed with different values of elevation cut-off angles. The regional network has been processed using different cases of combined satellite systems. These systems are GPS, GLONASS and BEIDOU. For the permanent network, in the condition of open sky view, the average coordinate errors for GPS, GLONASS and combined solution are respectively 16.5, 25.0 and 36.0 mm. The solutions by using GPS only are more accurate than other cases and there are no clear improvements from combined GLONASS with GPS observations. The significance of combined GPS and GLONASS solutions arise when the elevation cut-off angle was set to 40° and more which represent the extremely limited sky view such as urban and narrow canyons. For the regional network, the results indicated that combined GPS with BEIDOU is the best case because it achieved the smallest closure error with 19.50 mm. GPS only is better than GLONASS only, BEIDOU only, combined solution between GPS and GLONASS and combined GPS with GLONASS and BEIDOU.
Author Related Publications
Department Related Publications
Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021
More
Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021
More
Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014
More
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف