Fuzzy model for Libyan construction projects delivery system selection

Faculty Engineering Year: 2024
Type of Publication: ZU Hosted Pages:
Authors:
Journal: international journal of construction management Taylor & Francis Group Volume: 24
Keywords : Fuzzy model , Libyan construction projects delivery    
Abstract:
The construction project delivery system may be traditional or non-traditional, dependent upon the project-specific requirements and construction industry climate. Many factors are to be considered when making a decision, making it a multi-criteria decision. At the first stage of a project, most selection factors are vague. The project delivery system selection influences all project stages. In the next decade for Libya, there is a tremendous need to adopt a Projects Delivery System (PDS), which avoids the adverse objectives and conflicts that have characterized the Libyan construction industry for too long. This paper aims to assist decision-makers in understanding these concepts better. By utilizing the Fuzzy model, based on proposed criteria assigned to delivery systems evaluation for Libyan construction projects and the opinion of experts, PDSs were evaluated. The study outcome is twofold. Firstly, it selects the proper criteria and explores a Libyan construction project delivery decision-making system based on the Fuzzy theory perspective. Then has ranked the project delivery systems for the Libyan construction industry as follows: 1st rank construction manager at risk, 2nd rank construction manager as an agency, 3rd rank design-build, and 4th rank design-bid-build system. This study can be a quick and effective approach for construction owners.
   
     
 
       

Author Related Publications

  • Medhat Abdelrahman Youssef Ismyel, "Value engineering: Case study of Libyan educational buildings", Alexandria Engineering Journal, 2023 More
  • Medhat Abdelrahman Youssef Ismyel, "Impact Factors on Subcontractor's Cash Flow Management", Civil Engineering Journal, 2023 More
  • Medhat Abdelrahman Youssef Ismyel, "Repetitive Projects Scheduling to Minimize Idle Time: A Case Study of Libyan Electricity Infrastructure Projects", Science Publishing Group, 2023 More
  • Medhat Abdelrahman Youssef Ismyel, "Technical Audit and Unethical Practices in the Construction Industry", Ital Publication, 2023 More
  • Medhat Abdelrahman Youssef Ismyel, "Libyan Construction Projects Delivery Systems: Empirical Comparison Between Design-Build and Design-Bid-Build", science publishing group, 2017 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet