Constructability improvement of bridges using stepping formwork

Faculty Science Year: 2001
Type of Publication: Article Pages: 206-213
Authors: DOI: 10.1061/(ASCE)0733-9364(2001)127:3(206)
Journal: JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE ASCE-AMER SOC CIVIL ENGINEERS Volume: 127
Research Area: Construction \& Building Technology; Engineering ISSN ISI:000168840900005
Keywords : Constructability improvement , bridges using stepping formwork    
Abstract:
Many construction systems have been used to build several highway bridges and elevated roads in Egypt. Recently, the stepping shuttering system has been used in Egypt for cast-in-place concrete bridge. This system is most appropriate for concrete bridges of moderate spans ranging from 40 to 70 m. The stepping shuttering system provides appropriate means to satisfy local needs for concrete bridge construction in an urban environment, practically without infringing on traffic or property below. This paper presents an innovative method of construction that has been used in Egypt for the first time to build the 6th October Bridge extension. Issues regarding the constructability and innovation are highlighted, and the significant aspects during the bridge construction are documented. Also, the difficulties encountered and the lessons learned ate thoroughly investigated. In addition, evaluation of the system is discussed in terms of construction cost, schedule, and flexibility. Finally, this paper presents an innovative method that offers substantial opportunity for enhancing constructability of concrete bridges using the stepping shuttering system.
   
  Online    
PDF  
       
Tweet