Problems facing parties involved in build, operate, and transport projects in Egypt

Faculty Science Year: 2002
Type of Publication: Article Pages: 173-178
Authors: DOI: 10.1061/(ASCE)0742-597X(2002)18:4(173)
Journal: JOURNAL OF MANAGEMENT IN ENGINEERING ASCE-AMER SOC CIVIL ENGINEERS Volume: 18
Research Area: Engineering ISSN ISI:000228244700003
Keywords : Problems facing parties involved , build, operate,    
Abstract:
One of the newest financial schemes for environmental projects is the Build, Operate, and Transfer (BOT) concept, which is being used increasingly worldwide as a project delivery system by which governments obtain the infrastructure projects by private sector after a concession period free of charge. In the Egyptian environment up to now, promoters and investors have had many fears toward declared projects. This study aims to investigate the potential for implementing the BOT system in the Egyptian environment. This can be achieved by giving a clear view of BOT and of its problems, risk areas, and features, pertaining to the Egyptian environment, in order to maximize the benefits and minimize the risks as much as possible. The collected data was analyzed based on actual implementation in Egypt. This involved the following: (1) An overview of the critical success factors in order to achieve a BOT project; (2) an analysis of results obtained from questionnaires seeking to determine the possibility of occurrence of the different risk factors in the Egyptian environment, and their ranking-, (3) a comparison between the questionnaire results and the actual risks from requests for the proposal of locally advertised projects; and (4) a determination of the missed critical success factors in the Egyptian environment. The main conclusion of this study is that three critical success factors are essential for the success of BOT projects in Egypt: (1) Picking the right project; (2) competitive financial proposal; and (3) special features of bid.
   
  Online    
PDF  
       
Tweet