Evaluation of Cost Drivers for Field Canals Improvement Projects

Faculty Engineering Year: 2018
Type of Publication: ZU Hosted Pages: 53–65
Authors:
Journal: Water Resource Management Springer Netherlands Volume: 32
Keywords : Evaluation , Cost Drivers , Field Canals Improvement    
Abstract:
Field Canals Improvement Project (FCIP) aims to conserve fresh water. Several methods are existed to predict project preliminary cost. However, identification of model inputs remains a challenging task during model development. This study u
   
     
 
       

Author Related Publications

  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Developing A Quality Measure For Evaluating The Contractor Performance Ii Asphalt Pavement Construction", Chinese Society of Pavement Engineering, 2013 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Using MEPDG to Develop Rational Pay Factor for Hot Mix Asphalt Construction", International Organization Of Scientific Research, 2013 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Effect of Best Value Model Variables on Contractor Selection Decision", International Organization Of Scientific Research, 2014 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Utilizing Random Performance Records in the Best Value Model", Taylor & Francis, 2012 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Contractor Performance Evaluation for the Best-Value of Superpave Projects", ASCE, 2010 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet