Impact of sensitivity information on the prediction of project's duration using earned schedule method

Faculty Science Year: 2013
Type of Publication: Article Pages: 579-588
Authors: DOI: 10.1016/j.ijproman.2012.10.006
Journal: INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT ELSEVIER SCI LTD Volume: 31
Research Area: Business \& Economics ISSN ISI:000317372800009
Keywords : Earned value management, Project duration forecasting, Earned schedule, Critical activities, Time sensitivity measures    
Abstract:
Recently, the prediction of project duration has been investigated in earned value management (EVM) using three earned value methods, planed value (PVM), earned duration (EDM) and earned schedule (ESM). The investigation has shown that ESM method outperforms on average the other two methods and fails in case of wrong warning coming from non-critical activities which suffer from delays and/or ahead of schedule. The objective of this paper is twofold: first, we study the impact of the activities' sensitivity information on the forecasting accuracy of the ESM method. Second, we test the claim that in normal conditions the project performance indicator provided by ESM at higher work breakdown structure is reliable. More precisely, activity based sensitivity measures are used as weighing parameters of the activities to improve the schedule performance of a project by removing or decreasing the negative effect of wrong warning of the non-critical activities. The computational results of a simulation study on a big benchmark projects reveal that the sensitivity information are capable of improving the forecasting accuracy of the ESM method. (C) 2012 Elsevier Ltd. APM and IPMA. All rights reserved.
   
  Online    
PDF  
       
Tweet