Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model

Faculty Engineering Year: 2012
Type of Publication: ZU Hosted Pages: 132-143
Authors:
Journal: Housing and Building National Research Center Housing and Building National Research Center Volume: HBRC Journal (2012) 8
Keywords : Assessment , , expected cost , quality (COQ) in construction    
Abstract:
Many definitions for quality were provided by experts. Among these definitions are: quality is the fitness for use [14], conformance to requirements [4], quality is a predictable degree of uniformity and dependability, at low cost and sui
   
     
 
       

Author Related Publications

  • Hossameldien Hosny Mohamed Badie, "Optimum Organization Structure for Construction Projects (Management Tool for Selecting Organization in the Egyptian Construction Market)", IJESIT, 2013 More
  • Hossameldien Hosny Mohamed Badie, "Construction Claims Causes and Management Efficiency", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2013 More
  • Hossameldien Hosny Mohamed Badie, "(Effect of Inadequate Site Investigation on the Cost of Road Construction (Case Study", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2012 More
  • Hossameldien Hosny Mohamed Badie, "Effect of Re- Organization on the Performance of the Egyptian Economical Organization for Water and Waste water.", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2013 More
  • Hossameldien Hosny Mohamed Badie, "Evaluation of Change Management Efficiency of Construction Contractors", Housing and Building Research Center (HBRC) Journal , Elsevier., 2013 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet