Predicting the Construction Duration of Building Projects Using Artificial Neural Networks.

Faculty Engineering Year: 2014
Type of Publication: ZU Hosted Pages:
Authors:
Journal: International Journal of Applied Management Science (IJAMS), International Journal of Applied Management Science (IJAMS), Volume:
Keywords : Predicting , Construction Duration , Building Projects Using    
Abstract:
The accurate prediction of the duration of a construction project represents a critical factor for the feasibility study of this project. Employers are in an urgent need for reliable information about the construction duration in this early
   
     
 
       

Author Related Publications

  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Modelling the Financial Performance of Construction Companies Using Neural Networks via Genetic Algorithm.", Canadian Journal of Civil Engineering (CJCE), 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Estimating Cost Contingency for Highway Construction Projects Using Analytic Hierarchy Processes.", International Journal of Computer Science Issues (IJCSI), 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Reducing Construction Disputes through Effective Claims Management.", American Journal of Civil Engineering and Architecture (AJCEA), Science and Education Publishing,, 2014 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet