Estimating Cost Contingency for Highway Construction Projects Using Analytic Hierarchy Processes.

Faculty Engineering Year: 2014
Type of Publication: ZU Hosted Pages:
Authors:
Journal: International Journal of Computer Science Issues (IJCSI) International Journal of Computer Science Issues (IJCSI) Volume:
Keywords : Estimating Cost Contingency , Highway Construction Projects    
Abstract:
Winning a bid at a price that yields a profit, is one of the contractor's major goals from bidding. One of the significant components of markup is the risk allowance (contingencies). Therefore, contractors should be wise to consider the lik
   
     
 
       

Author Related Publications

  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Modelling the Financial Performance of Construction Companies Using Neural Networks via Genetic Algorithm.", Canadian Journal of Civil Engineering (CJCE), 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Measuring Important Factors Affecting Construction Projects Duration", Journal of Al Azhar Univ. Eng. Sector, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Reducing Construction Disputes through Effective Claims Management.", American Journal of Civil Engineering and Architecture (AJCEA), Science and Education Publishing,, 2014 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Predicting the Construction Duration of Building Projects Using Artificial Neural Networks.", International Journal of Applied Management Science (IJAMS),, 2014 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet