Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Analysis of the economic life of construction equipment in egypt
Faculty
Engineering
Year:
1992
Type of Publication:
Theses
Pages:
129
Authors:
Hossam ElDeen Hosnye Mohammed Badie
BibID
10326969
Keywords :
construction equipment
Abstract:
Construction equipment constitute a major investment for mostcontractors, especially heavy construction contractors. Consequently, thecontractors’ equipment policies greatly affect their project profitability.They have also a geat impact on the contractor’s ability to be competitive,in an economic sense, with other cor+ractor-s. Determination of the optimumtime at which a piece of construction equipment must be replaced is one ofthe most important elements of construction equipment policy.Studies aimed at optirnizing the economic service life (ESL) ofconstruction equipment have appeared in the literature for over 60 years.The development of the different methods and models that are used fordecision making in equipment replacement and the applications of thesemodels are the major areas investigated in these studies. However, thesemodels have not found application in practice, especially in Egypt, becousethey do not adequately reflect the local conditions.In this study a computerized mathematical model has been developed tostudy the economic service life (ESL) of construction equipment under thelocal conditions and regulations. Moreover, four categories of constructionequipment were selected as a test bed for this study; Earthmovingequipment, pavement equipment, cranes and concrete mixers. Sixty fivepieces of these equipment were chosen as case studies. These pieces wereowned and operated by six public sectors. The optimum replacement lives forthese equipment were calculated and compared with their actual ages. Anaverage value for the optimum replacement life was also identified.Additionally, the main defects of the equipment replacement policies in thesix sectors were presented. Finally, a sensltivity analysis study has beenconducted to identify the most affecting factors among those affecting the(ESL) of construction equipment.
PDF
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف