Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Contractor pay factor versus pavement performance
Faculty
Engineering
Year:
2009
Type of Publication:
Theses
Pages:
200
Authors:
Mohamed El-Sayed Mahmoud El-Tantawy
BibID
11187852
Keywords :
Highways engineering
Abstract:
This study aims to create a new contractor payment method for HWYconstruction works depends on actual as constructed pavement performance. Toachieve this objective, a comparison between as constructed and as designedpavement section was conducted by analyzing their performance usingKENLA YER program through two stages. In the first stage, ESAL’s wereestimated for the assumed as constructed pavement sections based on thecommon expected construction defects in terms of single defects as reduction inthickness ”T” or in modulus of resilience ”Mr” (140 case) or double defects, thatmean combining two defects (I225 case). A case study for triple and fourthdefects (IO cases) was analyzed to investigate the danger of combining defects.The second stage concerned with converting the obtained ESAL for asconstructed section to ”n2” years knowing pavement design life ”n I” using thedeveloped equation in this study. By making economical comparison of assumedcommon maintenance plane for as designed section versus as constructed section;contractor payment factor was created. There are 30 obtained figures for thismethod, from which user will use only 4 figures to apply the proposed method,depending on the type of construction defect and the design pavement life.Growth rate ”r” and money interest rate ”i” are also considered to give the newmethod straightness and accuracy. Finally, the study concluded that combinedconstruction defects have great effect on pavement life consequently highdifference between the traditional payment method and performance paymentmethod obtained by considering these defects. So, it is recommended to usepayment method depends on actual as constructed section perfonnance andconsider it as a whole object not some separated layers during paying forcontractor.
PDF
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف