Stable Schedules For Resource-Constrained Projects Under Uncertainty

Faculty Engineering Year: 2009
Type of Publication: Theses Pages: 211
Authors:
BibID 10693207
Keywords : Industrial Engineering    
Abstract:
In Ipractice A baelie Schedule For Resource -Constrained Project May Suffer from Several Types Disruption And A Reactive Scheduling Is Considered The Main Method For Re- Optimizing The Schedule This Method Does Not Guarantee Project Stability As It Usually Does Not Lead To Optimum Solutions Altermatively We Develop A rEACTIVE aLGORITHM fOR aLLOCATING rESOURCES tO The Activities Of The Baseline Schedule In order To Maximize Its Stability In The Presence Of Activity Duration Variability As A sOURCE oF dISRUPTION aS sHOWN iN cHAPER 3 Of This Dissertation Computational Results Obtained For A Sat Of Benchmark Problems Show That The Prepeosed Algorithm Performs Well Compared With Others In The Literature 
   
     