Zagazig University Digital Repository
Home
Thesis & Publications
All Contents
Publications
Thesis
Graduation Projects
Research Area
Research Area Reports
Search by Research Area
Universities Thesis
ACADEMIC Links
ACADEMIC RESEARCH
Zagazig University Authors
Africa Research Statistics
Google Scholar
Research Gate
Researcher ID
CrossRef
Construction engineering and management
Faculty
Engineering
Year:
1992
Type of Publication:
Theses
Pages:
141
Authors:
Mohamed Ismail Ahmed Amer
BibID
10340632
Keywords :
construction Management
Abstract:
Caisson vas used as the main construction block in theGreater Cairo Wastewater Project for the main pumping station; the Ameria tunnel pumpinq station (ATPS). Thisstation is one of the key components of this project. It is probably the larqest installation of its kind in the vorld.The objective of the Ameria tunnel pumping station is to lift the vaste vater 32.0m from the level of the collected tunnel at (-14.0) mean sea level (HSL) to the level of boxculverts at qround level (+ 18.0) HSL to continue the flow avay, under gravity, to the final treatment plant. the ATPS contain eiqht huqe centrifuqal pumps, each with the abilityto lift 3600 liters per second.The construction of ATPS is considered one of the highly technoloqical civil enqineering works constructed in Egypt.The objective of this study is to investigate the construction method of Aaeria tunnel pumping station caissonfrom the above mentioned aspect. To achieve this goal it is necessary to illustrate these methods, their adoption, problems faced and solutions innovated.
PDF
جامعة المنصورة
جامعة الاسكندرية
جامعة القاهرة
جامعة سوهاج
جامعة الفيوم
جامعة بنها
جامعة دمياط
جامعة بورسعيد
جامعة حلوان
جامعة السويس
شراقوة
جامعة المنيا
جامعة دمنهور
جامعة المنوفية
جامعة أسوان
جامعة جنوب الوادى
جامعة قناة السويس
جامعة عين شمس
جامعة أسيوط
جامعة كفر الشيخ
جامعة السادات
جامعة طنطا
جامعة بنى سويف