Using Neural Networks to Assign the Maximum Capital Due Date for Construction Projects.

Faculty Engineering Year: 2010
Type of Publication: ZU Hosted Pages:
Authors:
Journal: Proceeding of the Seventh International Conference on Engineering Computational Technology, Valencia, Spain,14-17 September 2010. Proceeding of the Seventh International Conference on Engineering Computational Technology, Valencia,Spain,14-17 September 2010. Volume:
Keywords : Using Neural Networks , Assign , Maximum Capital    
Abstract:
In this research the artificial neural network is used to facilitate the prediction of the maximum capital required and its due date.
   
     
 
       

Author Related Publications

  • Hossameldien Hosny Mohamed Badie, "Optimum Organization Structure for Construction Projects (Management Tool for Selecting Organization in the Egyptian Construction Market)", IJESIT, 2013 More
  • Hossameldien Hosny Mohamed Badie, "Construction Claims Causes and Management Efficiency", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2013 More
  • Hossameldien Hosny Mohamed Badie, "(Effect of Inadequate Site Investigation on the Cost of Road Construction (Case Study", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2012 More
  • Hossameldien Hosny Mohamed Badie, "Effect of Re- Organization on the Performance of the Egyptian Economical Organization for Water and Waste water.", Engineering Research Journal, Faculty of Engineering , Mataria, Cairo., 2013 More
  • Hossameldien Hosny Mohamed Badie, "Evaluation of Change Management Efficiency of Construction Contractors", Housing and Building Research Center (HBRC) Journal , Elsevier., 2013 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet