Using MEPDG to Develop Rational Pay Factor for Hot Mix Asphalt Construction

Faculty Engineering Year: 2013
Type of Publication: ZU Hosted Pages: 30-37
Authors:
Journal: IOSR Journal of Mechanical and Civil Engineering International Organization Of Scientific Research Volume: 10
Keywords : Using MEPDG , Develop Rational , Factor , , , Asphalt    
Abstract:
Most highway agencies are using subjective measures to rate the quality of construction projects. The main purposes of rating the contractor performance are for qualification, bidding, or payment schedules. The pay factor (PF) can be define
   
     
 
       

Author Related Publications

  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Developing A Quality Measure For Evaluating The Contractor Performance Ii Asphalt Pavement Construction", Chinese Society of Pavement Engineering, 2013 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Effect of Best Value Model Variables on Contractor Selection Decision", International Organization Of Scientific Research, 2014 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Utilizing Random Performance Records in the Best Value Model", Taylor & Francis, 2012 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "Contractor Performance Evaluation for the Best-Value of Superpave Projects", ASCE, 2010 More
  • Ahmed Hessien Mahmoud Mohamed Elyamany, "A Rational Best-Value Model Based on Expected Performance", Transportation Research Board of the National Academies, 2008 More

Department Related Publications

  • Ahmed Elsayed Ali Mahmoud, "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)", Sustainable Engineering and Science, 2021 More
  • Gamal Saber Ahmed Elfiky, "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Mohammed Ahmed Ali Alashkar , "Determination of local gravimetric geoid model over Egypt using LSC and FFT estimation techniques based on different satellite- and ground-based datasets", Taylor & Francis, 2021 More
  • Ahmed Hussien Ibrahim Mahmmoud, "Management of Construction Cost Contingency Covering Upside and Downside Risks.", Alexandria Engineering Journal (AEJ),, 2014 More
Tweet